Assessment Year | 2006 |
---|---|
Principal Product | Ammunition |
NAICS | 332992: Small Arms Ammunition Manufacturing |
SIC | 3482: Small Arms Ammunition |
Sales Range | $100 M to 500M |
# of Employees | 1,100 |
Plant Area |
960,000
ft2
|
Annual Production | 52,900,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $965,627 | 25,047,000 |
kWh
|
$0.039 |
Electricity Demand | $391,859 | 51,840 |
kW-mo/yr
|
$7.56 |
Natural Gas | $1,375,982 | 162,418 |
MMBtu
|
$8.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $145,207 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,436 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $41,729 | $4,200 |
$32,813
863,510
kWh
|
$8,916
-
kW-mo/yr
|
- | |
02 | 2.4234: Cool compressor air intake with heat exchanger | $24,709 | $6,500 |
$19,788
520,684
kWh
|
$4,921
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,998 | $25 |
$8,626
227,005
kWh
|
$2,372
-
kW-mo/yr
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $6,184 | $74 |
$4,864
127,896
kWh
|
$1,320
-
kW-mo/yr
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $17,292 | $44,400 |
$11,203
294,840
kWh
|
$6,089
-
kW-mo/yr
|
- | |
06 | 2.2437: Recover waste heat from equipment | $16,584 | $15,900 |
$(-1,335.0)
(-35,119)
kWh
|
$(-363.0)
-
kW-mo/yr
|
$18,282
-
MMBtu
|
|
07 | 2.2437: Recover waste heat from equipment | $25,628 | $15,200 |
$(-445.0)
(-11,706)
kWh
|
$(-121.0)
-
kW-mo/yr
|
$26,194
-
MMBtu
|
|
08 | 2.2511: Insulate bare equipment | $2,083 | $1,969 | - | - |
$2,083
-
MMBtu
|
|
TOTAL RECOMMENDED | $145,207 | $88,268 |
$75,514
1,987,110
kWh
|
$23,134
-
kW-mo/yr
|
$46,559
-
MMBtu
|
||
TOTAL IMPLEMENTED | $77,436 | $10,725 |
$61,227
1,611,199
kWh
|
$16,209
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs