ITAC Assessment: TT0161
ITAC logo
ITAC Assessment: TT0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Crushed, Screened, Ground Limestone
NAICS 327991: Cut Stone and Stone Product Manufacturing
SIC 3281: Cut Stone and Stone Products
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 20,000
ft2
Annual Production 1,000,000
ton
Production Hrs. Annual 6,864
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,062,081 17,157,878
kWh
Electricity Demand $495,647 33,824
kW-mo/yr
LPG $171,962 21,309
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $204,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $90,145 $45,000 $63,775
1,030,286
kWh
$26,370
-
kW-mo/yr
- -
02 2.4131: Size electric motors for peak operating efficiency $26,125 $2,000 $18,483
298,584
kWh
$7,642
-
kW-mo/yr
- -
03 2.2414: Use waste heat from hot flue gases to preheat $23,126 $10,000 - - - $23,126
-
gal
04 2.4131: Size electric motors for peak operating efficiency $19,704 $2,000 $13,936
225,139
kWh
$5,768
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $17,886 $6,135 - - - $17,886
-
gal
06 2.4131: Size electric motors for peak operating efficiency $12,012 $2,000 $8,498
137,280
kWh
$3,514
-
kW-mo/yr
- -
07 2.4226: Use / purchase optimum sized compressor $6,860 $12,000 $6,860
110,818
kWh
- - -
08 2.4239: Eliminate or reduce compressed air usage $2,785 $300 $2,785
44,992
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,583 $1,140 $1,827
29,515
kWh
$756
-
kW-mo/yr
- -
10 2.2522: Isolate hot or cold equipment $1,634 $600 - - - $1,634
-
gal
11 2.2414: Use waste heat from hot flue gases to preheat $1,222 $2,000 - - $1,222
-
MMBtu
-
12 2.7144: Install spectral reflectors / delamp $202 $20 $190
3,075
kWh
$12
-
kW-mo/yr
- -
TOTAL RECOMMENDED $204,284 $83,195 $116,354
1,879,689
kWh
$44,062
-
kW-mo/yr
$1,222
-
MMBtu
$42,646
-
gal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (haz) Savings