ITAC Assessment: TT0157
ITAC logo
ITAC Assessment: TT0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product metal can ends
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 206
Plant Area 210,652
ft2
Annual Production 204,300,401,502
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $900,909 14,475,618
kWh
Electricity Demand $290,742 26,321
kW-mo/yr
Natural Gas $325,538 52,993
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $292,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $205,506

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $51,147 $344,210 $41,014
661,531
kWh
$1,037
-
kW-mo/yr
- $9,096
02 2.3132: Recharge batteries on during off-peak demand periods $39,567 - - $39,567
-
kW-mo/yr
- -
03 2.4224: Upgrade controls on compressors $32,298 $15,201 $25,745
415,246
kWh
$6,553
-
kW-mo/yr
- -
04 2.2515: Use optimum thickness insulation $32,011 $40,000 - - $32,011
-
MMBtu
-
05 2.4224: Upgrade controls on compressors $26,007 $26,000 $25,466
410,745
kWh
$541
-
kW-mo/yr
- -
06 2.7243: Improve air circulation with destratification fans / other methods $29,361 $9,500 $16,739
269,992
kWh
- $12,622
-
MMBtu
-
07 2.4239: Eliminate or reduce compressed air usage $25,293 $3,465 $24,943
402,269
kWh
$350
-
kW-mo/yr
- -
08 2.7425: Clean or color roof to reduce solar load $26,456 $157,989 $27,144
437,821
kWh
$4,423
-
kW-mo/yr
$(-5,111.0)
-
MMBtu
-
09 2.4224: Upgrade controls on compressors $26,246 $2,400 $26,246
423,297
kWh
- - -
10 2.1113: Reduce combustion air flow to optimum $2,978 $1,000 - - $2,978
-
MMBtu
-
11 2.4133: Use most efficient type of electric motors $958 $2,131 $693
11,178
kWh
$265
-
kW-mo/yr
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $278 $240 $133
2,145
kWh
$33
-
kW-mo/yr
- $112
TOTAL RECOMMENDED $292,600 $602,136 $188,123
3,034,224
kWh
$52,769
-
kW-mo/yr
$42,500
-
MMBtu
$9,208
TOTAL IMPLEMENTED $205,506 $214,795 $146,416
2,361,515
kWh
$51,467
-
kW-mo/yr
$7,511
-
MMBtu
$112
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings