ITAC Assessment: AS0121
ITAC logo
ITAC Assessment: AS0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Electrical Apparatus
NAICS
n/a
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 28,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,409 766,120
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,625 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,984 $5,397 $1,984
23,154
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $373 $32 $373
4,396
kWh
03 2.7135: Install occupancy sensors $515 $335 $515
6,155
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $520 $360 $520
6,155
kWh
05 2.4133: Use most efficient type of electric motors $440 $881 $440
5,275
kWh
06 2.4314: Use synthetic lubricant $256 $451 $256
1,758
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $426 $200 $426
4,982
kWh
08 2.7261: Install timers and/or thermostats $1,111 $1,170 $1,111
12,896
kWh
TOTAL RECOMMENDED $5,625 $8,826 $5,625
64,771
kWh
TOTAL IMPLEMENTED $5,625 $8,826 $5,625
64,771
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs