ITAC Assessment: TT0154
ITAC logo
ITAC Assessment: TT0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Vinyl Windows
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 72,323
ft2
Annual Production 16,000
pieces
Production Hrs. Annual 4,312
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,715 883,200
kWh
Electricity Demand $30,100 2,856
kW-mo/yr
Natural Gas $19,248 2,008
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,612 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,176

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,474 $54,305 $8,059
111,774
kWh
$3,415
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $7,653 $5,000 $5,432
75,334
kWh
$2,221
-
kW-mo/yr
- -
03 2.8114: Change rate schedules or other changes in utility service $7,288 $300 - - $7,288 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,479 $3,000 $5,479
75,992
kWh
- - -
05 4.812: Apply for investment incentives $5,176 $40 - - - $5,176
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,216 $2,000 $2,216
30,735
kWh
- - -
07 2.6218: Turn off equipment when not in use $326 $460 $326
4,521
kWh
- - -
TOTAL RECOMMENDED $39,612 $65,105 $21,512
298,356
kWh
$5,636
-
kW-mo/yr
$7,288 $5,176
TOTAL IMPLEMENTED $5,176 $40 - - - $5,176
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs