Assessment Year | 2004 |
---|---|
Principal Product | Sports fishing boat |
NAICS | 336612: Boat Building |
SIC | 3732: Boat Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
385,000
ft2
|
Annual Production | 70
pieces
|
Production Hrs. Annual | 3,099
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,285 | 3,065,500 |
kWh
|
$0.051 |
Electricity Demand | $85,231 | 10,925 |
kW-mo/yr
|
$7.80 |
Electricity Fees | $49,884 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,324 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $61,143 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $13,096 | $600 | - | - | $13,096 | |
02 | 2.6218: Turn off equipment when not in use | $22,325 | $2,300 |
$22,325
374,522
kWh
|
- | - | |
03 | 2.8118: Check for accuracy of utility / power meters | $15,302 | $270 |
$15,302
167,340
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,010 | $590 |
$7,090
134,771
kWh
|
$(-2,080.0) | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $25,036 | $50 |
$25,036
475,894
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,772 | $25,286 |
$8,772
166,726
kWh
|
- | - | |
07 | 2.4323: Use optimum size and capacity equipment | $1,783 | $4,328 |
$1,783
33,896
kWh
|
- | - | |
TOTAL RECOMMENDED | $91,324 | $33,424 |
$80,308
1,353,149
kWh
|
$(-2,080.0) | $13,096 | ||
TOTAL IMPLEMENTED | $61,143 | $28,226 |
$63,223
1,151,913
kWh
|
$(-2,080.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs