ITAC Assessment: TT0127
ITAC logo
ITAC Assessment: TT0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Carpet
NAICS 314110: Carpet and Rug Mills
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 275,000
ft2
Annual Production 20,508
thousand feet
Production Hrs. Annual 5,460
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,767 5,905,200
kWh
Electricity Demand $184,026 15,218
kW-mo/yr
Electricity Fees $(-43,063.0) -
Natural Gas $327,212 48,002
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $990

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $34,016 $68,097 - - $34,016
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $73,188 $228,000 $47,648
744,499
kWh
$25,540
-
kW-mo/yr
-
03 2.4225: Install common header on compressors $5,171 $25 $5,171
80,800
kWh
- -
04 2.4323: Use optimum size and capacity equipment $600 $25 $477
7,446
kWh
$123
-
kW-mo/yr
-
05 2.7122: Disconnect ballasts $390 $130 $310
4,840
kWh
$80
-
kW-mo/yr
-
TOTAL RECOMMENDED $113,365 $296,277 $53,606
837,585
kWh
$25,743
-
kW-mo/yr
$34,016
-
MMBtu
TOTAL IMPLEMENTED $990 $155 $787
12,286
kWh
$203
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs