ITAC Assessment: TT0114
ITAC logo
ITAC Assessment: TT0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product yeast
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 60
Plant Area 74,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,500,819 23,639,700
kWh
Electricity Demand $512,223 46,645
kW-mo/yr
Natural Gas $59,957 66,661
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,784

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 3.1191: Change procedures / equipment / operating conditions $7,820 - $7,820
124,134
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $42 - $42
659
kWh
- -
03 2.6218: Turn off equipment when not in use $13,529 $125 $13,529
214,753
kWh
- -
04 2.4157: Establish a predictive maintenance program $6,310 $9,125 $5,480
86,983
kWh
$830
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $360 $315 $175
2,784
kWh
$42
-
kW-mo/yr
$144
06 2.7135: Install occupancy sensors $6,033 $5,950 $6,033
95,765
kWh
- -
07 2.4131: Size electric motors for peak operating efficiency $7,988 $15,000 $7,988
126,800
kWh
- -
TOTAL RECOMMENDED $42,082 $30,515 $41,067
651,878
kWh
$872
-
kW-mo/yr
$144
TOTAL IMPLEMENTED $27,784 $6,390 $27,599
438,095
kWh
$42
-
kW-mo/yr
$144
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs