ITAC Assessment: TT0113
ITAC logo
ITAC Assessment: TT0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Food Packaging
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 400,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,837,515 102,858,600
kWh
Electricity Demand $1,094,440 204,169
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4235: Remove or close off unneeded compressed air lines $12,194 - $11,197
186,625
kWh
$997
-
kW-mo/yr
02 2.2511: Insulate bare equipment $29,010 - $29,010
483,500
kWh
-
03 2.7122: Disconnect ballasts $1,433 - $1,419
23,652
kWh
$14
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $135 $114 $134
2,247
kWh
$1
-
kW-mo/yr
05 2.7135: Install occupancy sensors $14,759 $20,200 $14,000
233,333
kWh
$759
-
kW-mo/yr
06 2.4151: Develop a repair/replace policy $21,613 $30,289 $12,978
216,307
kWh
$8,635
-
kW-mo/yr
07 2.4224: Upgrade controls on compressors $2,195 $5,600 $2,195
36,583
kWh
-
TOTAL RECOMMENDED $81,339 $56,203 $70,933
1,182,247
kWh
$10,406
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs