ITAC Assessment: TT0104
ITAC logo
ITAC Assessment: TT0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Hardwood Lumber
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 500,000
ft2
Annual Production 24,000
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,489 4,078,440
kWh
Electricity Demand $114,934 11,151
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,055 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,108

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4113: Install motor voltage controller on lightly loaded motors $382 $50 $320
4,575
kWh
$62
-
kW-mo/yr
02 2.7135: Install occupancy sensors $13,653 $5,720 $13,653
195,043
kWh
-
03 2.4157: Establish a predictive maintenance program $8,455 $13,594 $6,848
97,834
kWh
$1,607
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,565 $16,000 $6,565
93,792
kWh
-
TOTAL RECOMMENDED $29,055 $35,364 $27,386
391,244
kWh
$1,669
-
kW-mo/yr
TOTAL IMPLEMENTED $22,108 $19,314 $20,501
292,877
kWh
$1,607
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs