ITAC Assessment: TT0103
ITAC logo
ITAC Assessment: TT0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Power tools, tool storage, and professional hand tools
NAICS 333515: Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range less than $500
k
# of Employees 125
Plant Area 180,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,712
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,477,883 23,464,800
kWh
Electricity Demand $558,951 48,227
kW-mo/yr
Natural Gas $348,242 99,497
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $19,502 - - $19,502
-
MMBtu
-
02 2.7243: Improve air circulation with destratification fans / other methods $9,152 $35,480 $9,152
86,665
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $12,318 $5,300 $12,318
111,989
kWh
- -
04 2.4155: Standardize motor inventory $0 - - - $0
05 2.4239: Eliminate or reduce compressed air usage $35,332 $1,960 $35,332
321,201
kWh
- -
TOTAL RECOMMENDED $76,304 $42,740 $56,802
519,855
kWh
$19,502
-
MMBtu
$0
TOTAL IMPLEMENTED $31,820 $5,300 $12,318
111,989
kWh
$19,502
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs