Assessment Year | 2012 |
---|---|
Principal Product | Industrial rollers |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
20,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,808
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,788 | 2,077,010 |
kWh
|
$0.066 |
Electricity Demand | $85,546 | 7,135 |
kW-mo/yr
|
$11.99 |
Natural Gas | $7,307 | 666 |
MMBtu
|
$10.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,771 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.2611: Moderate cooling tower outlet temperature | $192 | $25 |
$154
2,321
kWh
|
$38
-
kW-mo/yr
|
- | |
02 | 2.3212: Optimize plant power factor | $1,465 | $3,978 | - |
$1,465
-
kW-mo/yr
|
- | |
03 | 2.4131: Size electric motors for peak operating efficiency | $4,506 | $5,300 |
$3,341
50,625
kWh
|
$1,165
-
kW-mo/yr
|
- | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $800 | $850 |
$800
12,000
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,989 | $10,200 |
$1,767
26,520
kWh
|
$1,222
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $626 | $11,880 |
$370
5,560
kWh
|
$256
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,346 | $3,350 |
$796
11,940
kWh
|
$550
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $77 | $1,014 |
$46
690
kWh
|
$31
-
kW-mo/yr
|
- | |
09 | 3.4155: Meter waste water | $3,603 | $750 | - | - |
$3,603
-
Tgal
|
|
10 | 2.2192: Use heat exchange fluids instead of steam in pipeline tracing systems | $19,167 | $47,935 |
$9,858
149,363
kWh
|
$9,309
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $34,771 | $85,282 |
$17,132
259,018
kWh
|
$14,036
-
kW-mo/yr
|
$3,603
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs