ITAC Assessment: TT0080
ITAC logo
ITAC Assessment: TT0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Explosives
NAICS 325920: Explosives Manufacturing
SIC 2892: Explosives
Sales Range $10
M
to 50
M
# of Employees 101
Plant Area 73,468
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,821 787,584
kWh
Electricity Fees $4,200 -
Natural Gas $71,963 7,032
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,663

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,663 $100 $1,663
14,497
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,837 $7,143 $7,611
66,360
kWh
$226
03 2.7142: Utilize higher efficiency lamps and/or ballasts $546 $977 $329
2,870
kWh
$217
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,064 $4,400 $1,721
15,557
kWh
$343
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,663 $10,287 $1,451
12,654
kWh
$212
06 2.7261: Install timers and/or thermostats $3,475 $400 $3,475
31,448
kWh
-
TOTAL RECOMMENDED $17,248 $23,307 $16,250
143,386
kWh
$998
TOTAL IMPLEMENTED $1,663 $100 $1,663
14,497
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs