| Assessment Year | 2011 |
|---|---|
| Principal Product | Industrial Dust Collectors |
| NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
| SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 195 |
| Plant Area |
139,000
ft2
|
| Annual Production | 720
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $96,853 | 3,398,360 |
kWh
|
$0.028 |
| Electricity Demand | $44,065 | 9,881 |
kW-mo/yr
|
$4.46 |
| Natural Gas | $102,165 | 29,158 |
MMBtu
|
$3.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,969 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $610 | - |
$610
21,400
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $472 | - |
$472
16,570
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,334 | $7,975 |
$1,943
68,172
kWh
|
$4,391
-
kW-mo/yr
|
|
| 04 | 2.7241: Install outside air damper / economizer on hvac unit | $990 | $5,400 |
$990
34,737
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,757 | $80,684 |
$10,580
371,255
kWh
|
$3,177
-
kW-mo/yr
|
|
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,806 | $18,000 |
$2,806
98,460
kWh
|
- | |
| TOTAL RECOMMENDED | $24,969 | $112,059 |
$17,401
610,594
kWh
|
$7,568
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs