ITAC Assessment: TT0076
ITAC logo
ITAC Assessment: TT0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Labels
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 60,000
ft2
Annual Production 29,150
thousand feet
Production Hrs. Annual 4,500
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,532 1,264,600
kWh
Electricity Demand $42,603 3,522
kW-mo/yr
Electricity Fees $1,922 -
Natural Gas $5,684 588
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $7,311 - $4,363
66,400
kWh
$2,948
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,661 $5,000 $4,661
70,920
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,735 $1,654 $257
3,907
kWh
$158
-
kW-mo/yr
$1,320
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,371 $4,540 $1,369
20,830
kWh
- $2
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,101 $13,238 $1,938
29,486
kWh
$652
-
kW-mo/yr
$511
TOTAL RECOMMENDED $18,179 $24,432 $12,588
191,543
kWh
$3,758
-
kW-mo/yr
$1,833
TOTAL IMPLEMENTED $11,972 $5,000 $9,024
137,320
kWh
$2,948
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs