| Assessment Year | 2010 |
|---|---|
| Principal Product | Concrete Block |
| NAICS | 327331: Concrete Block and Brick Manufacturing |
| SIC | 3271: Concrete Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
40,000
ft2
|
| Annual Production | 7,800,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $97,794 | 976,340 |
kWh
|
$0.10 |
| Electricity Fees | $1,467 | - |
|
- |
| Natural Gas | $1,225 | 74 |
MMBtu
|
$16.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,197 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,618 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,559 | $10,900 |
$4,559
53,067
kWh
|
|
| 02 | 2.7145: Install skylights | $7,020 | $12,100 |
$7,020
78,000
kWh
|
|
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,034 | - |
$1,034
12,160
kWh
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $584 | $850 |
$584
6,875
kWh
|
|
| TOTAL RECOMMENDED | $13,197 | $23,850 |
$13,197
150,102
kWh
|
||
| TOTAL IMPLEMENTED | $1,618 | $850 |
$1,618
19,035
kWh
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs