Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Concrete Block
NAICS 327331: Concrete Block and Brick Manufacturing
SIC 3271: Concrete Block and Brick
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 40,000
ft2
Annual Production 7,800,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,794 976,340
kWh
Electricity Fees $1,467 -
Natural Gas $1,225 74
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,559 $10,900 $4,559
53,067
kWh
02 2.7145: Install skylights $7,020 $12,100 $7,020
78,000
kWh
03 2.6212: Turn off equipment during breaks, reduce operating time $1,034 - $1,034
12,160
kWh
04 2.4221: Install compressor air intakes in coolest locations $584 $850 $584
6,875
kWh
TOTAL RECOMMENDED $13,197 $23,850 $13,197
150,102
kWh
TOTAL IMPLEMENTED $1,618 $850 $1,618
19,035
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs