Assessment Year | 2010 |
---|---|
Principal Product | Mechanical Seals |
NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $50 M to 100M |
# of Employees | 224 |
Plant Area |
94,000
ft2
|
Annual Production | 1
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $277,183 | 7,463,000 |
kWh
|
$0.037 |
Electricity Demand | $155,448 | 55,669 |
kW-mo/yr
|
$2.79 |
Electricity Fees | $13,456 | - |
|
- |
Natural Gas | $26,054 | 2,171 |
MMBtu
|
$12.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,685 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,600 | $7,100 |
$2,400
63,072
kWh
|
$900
-
kW-mo/yr
|
$1,300 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,100 | $13,100 |
$4,100
106,373
kWh
|
$1,500
-
kW-mo/yr
|
$1,500 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,000 | $128,200 |
$19,500
506,304
kWh
|
$7,000
-
kW-mo/yr
|
$4,500 | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $1,685 | $2,500 |
$1,685
43,776
kWh
|
- | - | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $9,680 | $5,000 |
$9,680
251,280
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,445 | $25 |
$3,445
89,484
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,175 | $4,900 |
$5,175
134,226
kWh
|
- | - | |
TOTAL RECOMMENDED | $62,685 | $160,825 |
$45,985
1,194,515
kWh
|
$9,400
-
kW-mo/yr
|
$7,300 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs