ITAC Assessment: TT0055
ITAC logo
ITAC Assessment: TT0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Motor Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 56,000
ft2
Annual Production 17,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,418 644,400
kWh
Natural Gas $21,216 2,041
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Administrative Changes Savings
01 2.7314: Reduce ventilation air $5,009 $17,120 $5,009
55,663
kWh
- - - -
02 2.3212: Optimize plant power factor $11,430 $13,000 - - $11,430 - -
03 3.4111: Use closed cycle process to minimize waste water production $560 $825 - - - $560
-
Tgal
-
04 2.6218: Turn off equipment when not in use $1,500 $632 $1,500
16,101
kWh
- - - -
05 2.4322: Use or replace with energy efficient substitutes $520 $15 $520
2,400
kWh
- - - -
06 2.8121: Apply for tax-free status for energy purchases $253 $250 - - - - $253
07 2.4221: Install compressor air intakes in coolest locations $1,024 $40 $999
11,101
kWh
$25
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $20,296 $31,882 $8,028
85,265
kWh
$25
-
kW-mo/yr
$11,430 $560
-
Tgal
$253
TOTAL IMPLEMENTED $13,787 $14,130 $1,519
13,501
kWh
$25
-
kW-mo/yr
$11,430 $560
-
Tgal
$253
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs