ITAC Assessment: TT0053
ITAC logo
ITAC Assessment: TT0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Roasted Nuts
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range less than $500
k
# of Employees 330
Plant Area 158,000
ft2
Annual Production 54,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $438,153 7,494,840
kWh
Electricity Demand $154,320 13,376
kW-mo/yr
Natural Gas $106,464 16,808
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Gaseous Waste Savings
01 3.1161: Eliminate/reduce an operation $55,600 - - - $55,600
-
lb
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,700 $10,500 $1,800
40,800
kWh
$2,900
-
kW-mo/yr
-
03 2.4131: Size electric motors for peak operating efficiency $3,000 $10 $1,800
40,560
kWh
$1,200
-
kW-mo/yr
-
04 2.1135: Repair furnaces and oven doors so that they seal efficiently $2,700 $1,000 - - $2,700
-
lb
05 2.7134: Use photocell controls $340 $520 $340
7,500
kWh
- -
TOTAL RECOMMENDED $66,340 $12,030 $3,940
88,860
kWh
$4,100
-
kW-mo/yr
$58,300
-
lb
TOTAL IMPLEMENTED $10,400 $11,510 $3,600
81,360
kWh
$4,100
-
kW-mo/yr
$2,700
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs