Assessment Year | 2010 |
---|---|
Principal Product | Automotive Lighting |
NAICS | 335110: Electric Lamp Bulb and Part Manufacturing |
SIC | 3641: Electric Lamp Bulbs and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
140,000
ft2
|
Annual Production | 65,000,000
pieces
|
Production Hrs. Annual | 3,840
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $215,753 | 5,314,000 |
kWh
|
$0.041 |
Electricity Demand | $212,031 | 16,435 |
kW-mo/yr
|
$12.90 |
Electricity Fees | $7,663 | - |
|
- |
Natural Gas | $81,700 | 7,050 |
MMBtu
|
$11.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $95,379 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,579 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $40,500 | $2,900 |
$11,000
261,100
kWh
|
$29,500
-
kW-mo/yr
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $40,479 | $4,300 |
$10,966
261,100
kWh
|
$29,513
-
kW-mo/yr
|
- | |
03 | 2.2515: Use optimum thickness insulation | $6,800 | $1,000 | - | - |
$6,800
-
MMBtu
|
|
04 | 2.7221: Lower temperature during the winter season and vice-versa | $4,900 | $500 |
$1,600
38,400
kWh
|
$3,300
-
kW-mo/yr
|
- | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $2,200 | - | - | - |
$2,200
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $500 | $400 |
$500
11,636
kWh
|
- | - | |
TOTAL RECOMMENDED | $95,379 | $9,100 |
$24,066
572,236
kWh
|
$62,313
-
kW-mo/yr
|
$9,000
-
MMBtu
|
||
TOTAL IMPLEMENTED | $47,579 | $4,800 |
$12,566
299,500
kWh
|
$32,813
-
kW-mo/yr
|
$2,200
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs