ITAC Assessment: TT0045
ITAC logo
ITAC Assessment: TT0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Manufactured Homes
NAICS 321991: Manufactured Home (Mobile Home) Manufacturing
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area 150,000
ft2
Annual Production 240
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,699 1,841,101
kWh
Electricity Demand $65,297 8,847
kW-mo/yr
LPG $248,316 11,166
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $379,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $158,522

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.1336: Install equipment to utilize waste fuel $100,429 $34,284 - - $100,429
-
MMBtu
02 2.5111: Convert from indirect to direct fired systems $24,604 $76,000 - - $24,604
-
MMBtu
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $13,478 $55,000 $13,478
149,760
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,434 $45,960 $9,434
104,832
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $48,659 $64,000 - - $48,659
-
MMBtu
06 2.1332: Convert combustion equipment to burn natural gas $182,907 - - $(-65,559.0)
-
MMBtu
$248,466
-
MMBtu
TOTAL RECOMMENDED $379,511 $275,244 $22,912
254,592
kWh
$(-65,559.0)
-
MMBtu
$422,158
-
MMBtu
TOTAL IMPLEMENTED $158,522 $144,244 $9,434
104,832
kWh
- $149,088
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs