| Assessment Year | 2009 |
|---|---|
| Principal Product | Manufactured Homes |
| NAICS | 321991: Manufactured Home (Mobile Home) Manufacturing |
| SIC | 2451: Mobile Homes |
| Sales Range | $10 M to 50M |
| # of Employees | 117 |
| Plant Area |
150,000
ft2
|
| Annual Production | 240
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $165,699 | 1,841,101 |
kWh
|
$0.090 |
| Electricity Demand | $65,297 | 8,847 |
kW-mo/yr
|
$7.38 |
| LPG | $248,316 | 11,166 |
MMBtu
|
$22.24 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $379,511 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $158,522 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1336: Install equipment to utilize waste fuel | $100,429 | $34,284 | - | - |
$100,429
-
MMBtu
|
|
| 02 | 2.5111: Convert from indirect to direct fired systems | $24,604 | $76,000 | - | - |
$24,604
-
MMBtu
|
|
| 03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $13,478 | $55,000 |
$13,478
149,760
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,434 | $45,960 |
$9,434
104,832
kWh
|
- | - | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $48,659 | $64,000 | - | - |
$48,659
-
MMBtu
|
|
| 06 | 2.1332: Convert combustion equipment to burn natural gas | $182,907 | - | - |
$(-65,559.0)
-
MMBtu
|
$248,466
-
MMBtu
|
|
| TOTAL RECOMMENDED | $379,511 | $275,244 |
$22,912
254,592
kWh
|
$(-65,559.0)
-
MMBtu
|
$422,158
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $158,522 | $144,244 |
$9,434
104,832
kWh
|
- |
$149,088
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs