ITAC Assessment: TT0043
ITAC logo
ITAC Assessment: TT0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Plastic Botttle Closures
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area 100,000
ft2
Annual Production 2,760,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $977,346 19,153,750
kWh
Natural Gas $11,244 563
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,428

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 3.415: Reduction $5,562 $2,500 - $5,562
-
Tgal
-
02 2.422: Hardware $11,711 $300 $11,711
130,810
kWh
- -
03 3.411: Close cycle water use $2,148 $2,568 - - $2,148
-
gal
04 3.119: Miscellaneous $5,441 - $5,441
60,450
kWh
- -
05 2.413: Hardware $3,007 $1,395 $3,007
58,972
kWh
- -
TOTAL RECOMMENDED $27,869 $6,763 $20,159
250,232
kWh
$5,562
-
Tgal
$2,148
-
gal
TOTAL IMPLEMENTED $22,428 $6,763 $14,718
189,782
kWh
$5,562
-
Tgal
$2,148
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs