ITAC Assessment: TT0031
ITAC logo
ITAC Assessment: TT0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Corrigated Containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 142
Plant Area 225,000
ft2
Annual Production 264,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,466 2,909,880
kWh
Natural Gas $15,651 1,361
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,617

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $852 $850 $852
9,470
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,178 $480 $14,194
157,706
kWh
$3,984
-
kW-mo/yr
-
03 2.7134: Use photocell controls $23,587 $55,000 $23,587
262,080
kWh
- -
04 2.1336: Install equipment to utilize waste fuel $10,527 $36,300 - - $10,527
-
MMBtu
TOTAL RECOMMENDED $53,144 $92,630 $38,633
429,256
kWh
$3,984
-
kW-mo/yr
$10,527
-
MMBtu
TOTAL IMPLEMENTED $42,617 $56,330 $38,633
429,256
kWh
$3,984
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs