Assessment Year | 2000 |
---|---|
Principal Product | Capacitors |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 450 |
Plant Area |
173,800
ft2
|
Annual Production | 4,499,999,744
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $503,156 | 21,508,793 |
kWh
|
$0.023 |
Electricity Demand | $557,245 | 34,428 |
kW-mo/yr
|
$16.19 |
Electricity Fees | $8,064 | - |
|
- |
Natural Gas | $25,000 | 4,000 |
MMBtu
|
$6.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,151 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,376 | $5,400 |
$2,511
107,268
kWh
|
$2,865
-
kW-mo/yr
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,754 | $65,000 |
$9,755
417,057
kWh
|
$11,131
-
kW-mo/yr
|
$(-8,132.0)
-
MMBtu
|
|
03 | 2.7232: Replace existing hvac unit with high efficiency model | $18,564 | $37,378 |
$8,189
349,941
kWh
|
$10,375
-
kW-mo/yr
|
- | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $5,692 | $18,000 |
$5,692
243,259
kWh
|
- | - | |
05 | 2.7229: Air condition only space necessary | $14,765 | $42,000 |
$6,157
263,189
kWh
|
$8,608
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $57,151 | $167,778 |
$32,304
1,380,714
kWh
|
$32,979
-
kW-mo/yr
|
$(-8,132.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs