ITAC Assessment: NC0181
ITAC logo
ITAC Assessment: NC0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Capacitors
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 173,800
ft2
Annual Production 4,499,999,744
pieces
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $503,156 21,508,793
kWh
Electricity Demand $557,245 34,428
kW-mo/yr
Electricity Fees $8,064 -
Natural Gas $25,000 4,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,151 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,376 $5,400 $2,511
107,268
kWh
$2,865
-
kW-mo/yr
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,754 $65,000 $9,755
417,057
kWh
$11,131
-
kW-mo/yr
$(-8,132.0)
-
MMBtu
03 2.7232: Replace existing hvac unit with high efficiency model $18,564 $37,378 $8,189
349,941
kWh
$10,375
-
kW-mo/yr
-
04 2.7241: Install outside air damper / economizer on hvac unit $5,692 $18,000 $5,692
243,259
kWh
- -
05 2.7229: Air condition only space necessary $14,765 $42,000 $6,157
263,189
kWh
$8,608
-
kW-mo/yr
-
TOTAL RECOMMENDED $57,151 $167,778 $32,304
1,380,714
kWh
$32,979
-
kW-mo/yr
$(-8,132.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs