ITAC Assessment: TT0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Steering Gears
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 330
Plant Area 69,360
ft2
Annual Production 1,752,852
units
Production Hrs. Annual 8,765
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,028 4,502,000
kWh
Natural Gas $2,641 252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2628: Utilize a less expensive cooling method $13,583 $1,715 $13,583
272,676
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $302 $324 $236
4,716
kWh
$66
-
kW-mo/yr
03 2.3212: Optimize plant power factor $1,370 $5,170 $1,370
-
kWh
-
04 2.7145: Install skylights $12,995 $22,450 $12,995
99,906
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $6,947 $17,385 $6,947
2,371
kWh
-
TOTAL RECOMMENDED $35,197 $47,044 $35,131
379,669
kWh
$66
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs