Assessment Year | 2019 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
20,000
ft2
|
Annual Production | 30,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $22,867 | 617,520 |
kWh
|
$0.037 | |
Electricity Demand | $37,310 | 1,654 |
kW-mo/yr
|
$22.56 | |
Natural Gas | $31,277 | 5,434 |
MMBtu
|
$5.76 | |
Waste Disposal Costs | |||||
Water Usage | $30,859 | 4,287 |
Tgal
|
$7.20 | |
TOTAL YEARLY COSTS | $122,313 | ||||
RECOMMENDED SAVINGS* | $63,595 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $9,595 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Gaseous Waste Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.1175: Use a different or recycled raw material | $54,000 | $300,000 | - | - | - |
$54,000
-
lb
|
|
02 | 2.2515: Use optimum thickness insulation | $3,521 | $2,917 |
$1,921
51,767
kWh
|
$1,600
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,684 | $7,000 |
$705
19,008
kWh
|
$1,979
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,746 | $1,200 |
$582
15,693
kWh
|
$1,164
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,081 | $1,800 |
$415
11,195
kWh
|
$666
-
kW-mo/yr
|
- | - | |
06 | 2.6218: Turn off equipment when not in use | $130 | - |
$130
3,510
kWh
|
- | - | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $433 | $400 | - | - |
$433
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $63,595 | $313,317 |
$3,753
101,173
kWh
|
$5,409
-
kW-mo/yr
|
$433
-
MMBtu
|
$54,000
-
lb
|
||
TOTAL IMPLEMENTED | $9,595 | $13,317 |
$3,753
101,173
kWh
|
$5,409
-
kW-mo/yr
|
$433
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Gaseous Waste Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs