ITAC Assessment: IA0298
ITAC logo
ITAC Assessment: IA0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Dry Milk and Cream
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $100
M
to 500
M
# of Employees 99
Plant Area 37,000
ft2
Annual Production 630,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,053 5,766,600
kWh
Electricity Demand $83,136 10,392
kW-mo/yr
Natural Gas $745,312 150,007
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $145,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,732

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,312 $50 $1,062
22,750
kWh
$250
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $1,060 $100 $860
18,408
kWh
$200
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $3,302 $2,062 $3,302
70,713
kWh
- - -
04 2.4133: Use most efficient type of electric motors $1,683 - $1,347
28,836
kWh
$336
-
kW-mo/yr
- -
05 2.1133: Adjust burners for efficient operation $5,435 $850 - - $5,435
-
MMBtu
-
06 2.1213: Direct warmest air to combustion intake $4,535 $1,525 - - $4,535
-
MMBtu
-
07 4.441: Install automatic packing equipment $128,016 $125,000 $(-2,448.0)
(-52,416)
kWh
$(-576.0)
-
kW-mo/yr
- $131,040
TOTAL RECOMMENDED $145,343 $129,587 $4,123
88,291
kWh
$210
-
kW-mo/yr
$9,970
-
MMBtu
$131,040
TOTAL IMPLEMENTED $11,732 $2,962 $5,711
122,299
kWh
$586
-
kW-mo/yr
$5,435
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs