Assessment Year | 2002 |
---|---|
Principal Product | Dry Milk and Cream |
NAICS |
n/a
|
SIC | 2023: Dry, Condensed, and Evaporated Dairy Products |
Sales Range | $100 M to 500M |
# of Employees | 99 |
Plant Area |
37,000
ft2
|
Annual Production | 630,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $267,053 | 5,766,600 |
kWh
|
$0.046 |
Electricity Demand | $83,136 | 10,392 |
kW-mo/yr
|
$8.00 |
Natural Gas | $745,312 | 150,007 |
MMBtu
|
$4.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $145,343 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,732 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,312 | $50 |
$1,062
22,750
kWh
|
$250
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,060 | $100 |
$860
18,408
kWh
|
$200
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $3,302 | $2,062 |
$3,302
70,713
kWh
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,683 | - |
$1,347
28,836
kWh
|
$336
-
kW-mo/yr
|
- | - | |
05 | 2.1133: Adjust burners for efficient operation | $5,435 | $850 | - | - |
$5,435
-
MMBtu
|
- | |
06 | 2.1213: Direct warmest air to combustion intake | $4,535 | $1,525 | - | - |
$4,535
-
MMBtu
|
- | |
07 | 4.441: Install automatic packing equipment | $128,016 | $125,000 |
$(-2,448.0)
(-52,416)
kWh
|
$(-576.0)
-
kW-mo/yr
|
- | $131,040 | |
TOTAL RECOMMENDED | $145,343 | $129,587 |
$4,123
88,291
kWh
|
$210
-
kW-mo/yr
|
$9,970
-
MMBtu
|
$131,040 | ||
TOTAL IMPLEMENTED | $11,732 | $2,962 |
$5,711
122,299
kWh
|
$586
-
kW-mo/yr
|
$5,435
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs