| Assessment Year | 2007 |
|---|---|
| Principal Product | Ice Cream |
| NAICS | 424430: Dairy Product (except Dried or Canned) Merchant Wholesalers |
| SIC | 5143: Dairy Products, Except Dried or Canned |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
11,000
ft2
|
| Annual Production | 10,000
Tgal
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $289,436 | 4,142,000 |
kWh
|
$0.070 |
| Natural Gas | $72,106 | 7,752 |
MMBtu
|
$9.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,779 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,108 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $930 | $2,000 |
$930
20,422
kWh
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $345 | $110 |
$124
2,860
kWh
|
$156
-
kW-mo/yr
|
- | $65 | |
| 03 | 2.2511: Insulate bare equipment | $1,200 | $300 | - | - |
$1,200
-
MMBtu
|
- | |
| 04 | 2.2121: Increase amount of condensate returned | $741 | $350 | - | - |
$741
-
MMBtu
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,000 | $1,500 | - | - |
$9,000
-
MMBtu
|
- | |
| 06 | 2.2511: Insulate bare equipment | $563 | $100 | - | - |
$563
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $12,779 | $4,360 |
$1,054
23,282
kWh
|
$156
-
kW-mo/yr
|
$11,504
-
MMBtu
|
$65 | ||
| TOTAL IMPLEMENTED | $2,108 | $510 |
$124
2,860
kWh
|
$156
-
kW-mo/yr
|
$1,763
-
MMBtu
|
$65 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs