ITAC Assessment: TT0008
ITAC logo
ITAC Assessment: TT0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Ice Cream
NAICS 424430: Dairy Product (except Dried or Canned) Merchant Wholesalers
SIC 5143: Dairy Products, Except Dried or Canned
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 11,000
ft2
Annual Production 10,000
Tgal
Production Hrs. Annual 2,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,436 4,142,000
kWh
Natural Gas $72,106 7,752
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,779 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,108

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4222: Install adequate dryers on air lines to eliminate blowdown $930 $2,000 $930
20,422
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $345 $110 $124
2,860
kWh
$156
-
kW-mo/yr
- $65
03 2.2511: Insulate bare equipment $1,200 $300 - - $1,200
-
MMBtu
-
04 2.2121: Increase amount of condensate returned $741 $350 - - $741
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $9,000 $1,500 - - $9,000
-
MMBtu
-
06 2.2511: Insulate bare equipment $563 $100 - - $563
-
MMBtu
-
TOTAL RECOMMENDED $12,779 $4,360 $1,054
23,282
kWh
$156
-
kW-mo/yr
$11,504
-
MMBtu
$65
TOTAL IMPLEMENTED $2,108 $510 $124
2,860
kWh
$156
-
kW-mo/yr
$1,763
-
MMBtu
$65
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs