ITAC Assessment: TT0006
ITAC logo
ITAC Assessment: TT0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product brake calipers
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 396
Plant Area 216,000
ft2
Annual Production 5,500,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $944,023 33,327,338
kWh
Electricity Demand $703,494 69,662
kW-mo/yr
Natural Gas $288,581 28,839
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,311 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,574

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,109 $2,900 $19,109
1,213,605
kWh
02 2.4227: Use compressor air filters $7,465 $4,240 $7,465
255,813
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $42,910 $164,448 $42,910
967,104
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,827 $4,514 $1,827
42,276
kWh
TOTAL RECOMMENDED $71,311 $176,102 $71,311
2,478,798
kWh
TOTAL IMPLEMENTED $26,574 $7,140 $26,574
1,469,418
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs