ITAC Assessment: CO0723
ITAC logo
ITAC Assessment: CO0723
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Bison and beef processing
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 31,750
ft2
Annual Production 52,000
units
Production Hrs. Annual 2,145
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,067 3,322,326
kWh
Electricity Demand $177,614 8,111
kW-mo/yr
Electricity Fees $597 -
Natural Gas $120,699 39,132
MMBtu
TOTAL YEARLY COSTS $435,977
RECOMMENDED SAVINGS* $23,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $2,520 $3,200 $1,330
33,500
kWh
$1,190
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,250 $140 $690
17,600
kWh
$560
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,530 $20,440 $7,450
187,700
kWh
$8,530
-
kW-mo/yr
$290 - $(-1,740.0)
04 2.8121: Apply for tax-free status for energy purchases $5,280 $1,000 - - - $5,280 -
TOTAL RECOMMENDED $23,580 $24,780 $9,470
238,800
kWh
$10,280
-
kW-mo/yr
$290 $5,280 $(-1,740.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs