ITAC Assessment: TS0004
ITAC logo
ITAC Assessment: TS0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product MOLDED RUBBER PRODUCTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 409
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $501,231 6,660,024
kWh
Natural Gas $326,605 80,207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $8,158 $1,360 $8,158
100,821
kWh
-
02 2.3191: Use demand controller or load shedder $11,748 - $11,748
-
kWh
-
03 2.2511: Insulate bare equipment $396 $33 $445
5,569
kWh
$(-49.0)
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $15,174 $42,000 - $15,174
-
MMBtu
05 2.2511: Insulate bare equipment $11,480 $5,460 - $11,480
-
MMBtu
06 2.6232: Install set-back timers $5,296 - $6,000
75,029
kWh
$(-704.0)
-
MMBtu
07 2.7492: Use proper thickness of insulation on building envelope $10,352 $25,218 - $10,352
-
MMBtu
TOTAL RECOMMENDED $62,604 $74,071 $26,351
181,419
kWh
$36,253
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs