Assessment Year | 1984 |
---|---|
Principal Product | MOLDED RUBBER PRODUCTS |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 409 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $501,231 | 6,660,024 |
kWh
|
$0.075 |
Natural Gas | $326,605 | 80,207 |
MMBtu
|
$4.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,158 | $1,360 |
$8,158
100,821
kWh
|
- | |
02 | 2.3191: Use demand controller or load shedder | $11,748 | - |
$11,748
-
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $396 | $33 |
$445
5,569
kWh
|
$(-49.0)
-
MMBtu
|
|
04 | 2.2414: Use waste heat from hot flue gases to preheat | $15,174 | $42,000 | - |
$15,174
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $11,480 | $5,460 | - |
$11,480
-
MMBtu
|
|
06 | 2.6232: Install set-back timers | $5,296 | - |
$6,000
75,029
kWh
|
$(-704.0)
-
MMBtu
|
|
07 | 2.7492: Use proper thickness of insulation on building envelope | $10,352 | $25,218 | - |
$10,352
-
MMBtu
|
|
TOTAL RECOMMENDED | $62,604 | $74,071 |
$26,351
181,419
kWh
|
$36,253
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs