ITAC Assessment: SF0563
ITAC logo
ITAC Assessment: SF0563
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Sparkling and Still Wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $5
M
to 10
M
# of Employees 140
Plant Area 43,265
ft2
Annual Production 80,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,614 665,482
kWh
Electricity Fees $21,627 -
LPG $27,730 1,595
MMBtu
TOTAL YEARLY COSTS $197,971
RECOMMENDED SAVINGS* $25,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,798

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,685 $200 $2,685
10,119
kWh
- -
02 2.2511: Insulate bare equipment $339 $227 - $339
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $2,582 $2,866 $2,582
9,731
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,879 $17,947 $8,616
32,476
kWh
- $263
05 2.4322: Use or replace with energy efficient substitutes $10,998 $71,975 $10,998
41,455
kWh
- -
TOTAL RECOMMENDED $25,483 $93,215 $24,881
93,781
kWh
$339
-
MMBtu
$263
TOTAL IMPLEMENTED $22,798 $93,015 $22,196
83,662
kWh
$339
-
MMBtu
$263
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs