ITAC Assessment: OR0336
ITAC logo
ITAC Assessment: OR0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product ABS & CPVC Pipe
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 19
Plant Area 75,000
ft2
Annual Production 24,162,868
lb
Production Hrs. Annual 7,200
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,578 6,164,420
kWh
Electricity Demand $26,306 10,080
kW-mo/yr
Electricity Fees $3,676 -
Natural Gas $2,215 417
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $125,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings Primary Raw Material Savings
01 4.131: Modify process to reduce material use/cost $93,600 $200,000 - - - $93,600
02 4.126: Install sensors to detect defects $31,700 - - - $31,700 -
03 2.2612: Use cooling tower water instead of refrigeration $27,050 $8,200 $27,050
796,014
kWh
- - -
04 2.3212: Optimize plant power factor $3,716 $10,200 - $3,716 - -
TOTAL RECOMMENDED $156,066 $218,400 $27,050
796,014
kWh
$3,716 $31,700 $93,600
TOTAL IMPLEMENTED $125,300 $200,000 - - $31,700 $93,600
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs