ITAC Assessment: TR0048
ITAC logo
ITAC Assessment: TR0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Lemons, Limes, Mandarins, Navel Oranges, Balencias Oranges, Mineola
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 315
Plant Area 6,808,312
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,681 7,334,650
kWh
Electricity Demand $205,376 16,708
kW-mo/yr
Electricity Fees $27,609 -
Natural Gas $224,195 82,728
MMBtu
LPG $108,764 43,505
MMBtu
TOTAL YEARLY COSTS $816,625
RECOMMENDED SAVINGS* $201,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $33,304 $43,319 $31,815
1,060,486
kWh
$1,489
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $14,601 $10,663 $14,432
481,082
kWh
$169
-
kW-mo/yr
-
03 2.8121: Apply for tax-free status for energy purchases $27,609 $2,500 - - $27,609
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $3,211 $8,620 $2,056
68,536
kWh
$1,155
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $116,063 $1,521,071 $66,772
2,127,865
kWh
$49,290
-
kW-mo/yr
-
06 2.4224: Upgrade controls on compressors $6,430 $15,000 $4,118
137,250
kWh
$2,313
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $654 $1,350 $419
13,957
kWh
$235
-
kW-mo/yr
-
TOTAL RECOMMENDED $201,871 $1,602,523 $119,612
3,889,176
kWh
$54,650
-
kW-mo/yr
$27,609
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs