ITAC Assessment: TR0043
ITAC logo
ITAC Assessment: TR0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product High temperature alloy bonded and welded exhaust structures & metal honeycomb core
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 140,000
ft2
Annual Production 450
units
Production Hrs. Annual 7,224
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,448 8,782,588
kWh
Electricity Demand $194,324 24,924
kW-mo/yr
Electricity Fees $34,441 -
Waste Disposal Costs
Water Usage $31,084 3,283
Tgal
Water Disposal $25,109 3,127
Tgal
TOTAL YEARLY COSTS $664,405
RECOMMENDED SAVINGS* $69,147 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,031

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8121: Apply for tax-free status for energy purchases $33,031 $5,000 - - $33,031
02 2.3191: Use demand controller or load shedder $34,391 $20,500 - $34,391
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $1,725 $389 $1,327
30,723
kWh
$398
-
kW-mo/yr
-
TOTAL RECOMMENDED $69,147 $25,889 $1,327
30,723
kWh
$34,789
-
kW-mo/yr
$33,031
TOTAL IMPLEMENTED $33,031 $5,000 - - $33,031
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs