ITAC Assessment: TR0037
ITAC logo
ITAC Assessment: TR0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Injection Molding Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 473
Plant Area 350,000
ft2
Annual Production 1,950,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $835,483 11,854,800
kWh
Electricity Demand $160,855 21,935
kW-mo/yr
Electricity Fees $43,012 -
TOTAL YEARLY COSTS $1,039,350
RECOMMENDED SAVINGS* $290,138 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $5,441 $10,000 $4,763
67,577
kWh
$679
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $62,708 $9,722 $54,885
778,772
kWh
$7,823
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $7,119 $1,204 $6,214
88,166
kWh
$906
-
kW-mo/yr
04 2.3212: Optimize plant power factor $4,104 $9,500 - $4,104
-
kW-mo/yr
05 2.9114: Use solar heat to make electricty $210,765 $1,396,349 $183,962
2,610,265
kWh
$26,803
-
kW-mo/yr
TOTAL RECOMMENDED $290,138 $1,426,775 $249,823
3,544,779
kWh
$40,315
-
kW-mo/yr
TOTAL IMPLEMENTED $73,932 $20,426 $61,099
866,937
kWh
$12,833
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs