Assessment Year | 2005 |
---|---|
Principal Product | Wooden trusses |
NAICS | 321214: Truss Manufacturing |
SIC | 2439: Structural Wood Members, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
37,500
ft2
|
Annual Production | 60,000
thousand feet
|
Production Hrs. Annual | 5,772
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,735 | 1,569,459 |
kWh
|
$0.030 |
Electricity Demand | $72,189 | 5,631 |
kW-mo/yr
|
$12.82 |
Electricity Fees | $192 | - |
|
- |
Natural Gas | $26,763 | 3,354 |
MMBtu
|
$7.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $104,710 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,740 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.622: Install rotating carousels to reduce set-up times | $84,000 | $30,670 | - | - | - | - | - | $84,000 | |
02 | 2.3134: Shift from daytime to nighttime operation | $4,450 | - | - |
$6,530
-
kW-mo/yr
|
- | $(-2,080.0) | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,540 | $190 |
$1,330
42,700
kWh
|
$1,210
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.2711: Utilize outside air instead of conditioned air for drying | $200 | $170 |
$110
3,600
kWh
|
$90
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $6,190 | $17,170 | - | - |
$6,190
-
MMBtu
|
- | - | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $4,670 | $9,240 |
$(-230.0)
(-7,400)
kWh
|
$(-130.0)
-
kW-mo/yr
|
$5,030
-
MMBtu
|
- | - | - | |
07 | 2.2437: Recover waste heat from equipment | $1,740 | $980 | - | - |
$1,740
-
MMBtu
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $920 | $1,440 |
$330
10,500
kWh
|
$570
-
kW-mo/yr
|
- | $10 | $10 | - | |
TOTAL RECOMMENDED | $104,710 | $59,860 |
$1,540
49,400
kWh
|
$8,270
-
kW-mo/yr
|
$12,960
-
MMBtu
|
$(-2,070.0) | $10 | $84,000 | ||
TOTAL IMPLEMENTED | $2,740 | $360 |
$1,440
46,300
kWh
|
$1,300
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs