ITAC Assessment: AM0551
ITAC logo
ITAC Assessment: AM0551
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product buns and muffins
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 111
Plant Area 60,000
ft2
Annual Production 10,555,320
pieces
Production Hrs. Annual 8,012
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $410,161 8,730,720
kWh
Electricity Demand $164,773 14,083
kW-mo/yr
Natural Gas $447,470 62,160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $90,760

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $42,500 $1,550 $32,500
570,000
kWh
$10,000
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,950 $32,300 $14,500
254,400
kWh
$4,450
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $13,330 $12,480 $9,830
172,500
kWh
$3,500
-
kW-mo/yr
- - - -
04 2.8118: Check for accuracy of utility / power meters $6,600 $5,000 - - - - - $6,600
-
Tgal
05 3.7121: Improve handling practices $5,090 $110 - - - $5,090 - -
06 2.7124: Make a practice of turning off lights when not needed $3,800 $1,000 $2,940
51,530
kWh
$860
-
kW-mo/yr
- - - -
07 2.4314: Use synthetic lubricant $2,200 - $1,670
29,300
kWh
$530
-
kW-mo/yr
- - - -
08 2.2511: Insulate bare equipment $580 $90 - - $580
-
MMBtu
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $490 $380 $85
1,470
kWh
$20
-
kW-mo/yr
- - $385 -
TOTAL RECOMMENDED $93,540 $52,910 $61,525
1,079,200
kWh
$19,360
-
kW-mo/yr
$580
-
MMBtu
$5,090 $385 $6,600
-
Tgal
TOTAL IMPLEMENTED $90,760 $52,820 $59,855
1,049,900
kWh
$18,830
-
kW-mo/yr
- $5,090 $385 $6,600
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings