Assessment Year | 2025 |
---|---|
Principal Product | Turbine Repair Services |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 7699: Repair Shops and Related Services, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 222 |
Plant Area |
110,000
ft2
|
Annual Production | 35
units
|
Production Hrs. Annual | 4,375
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,952,519 | 6,487,804 |
kWh
|
$0.30 |
Electricity Demand | $1,164,278 | 15,253 |
kW-mo/yr
|
$76.33 |
Electricity Fees | $(-902,969.0) | - |
|
- |
Natural Gas | $30,053 | 2,339 |
MMBtu
|
$12.85 |
TOTAL YEARLY COSTS | $2,243,881 | |||
RECOMMENDED SAVINGS* | $2,133,723 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $963,108 | $710,032 |
$464,368
1,542,750
kWh
|
$498,740
-
kW-mo/yr
|
- | |
02 | 2.3141: Use battery storage for demand control | $966,126 | $35,339 |
$(-79,809.0)
(-265,147)
kWh
|
$1,045,935
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $38,554 | $8,532 |
$25,571
84,955
kWh
|
$12,983
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,605 | $7,436 |
$13,946
46,332
kWh
|
$10,659
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,044 | $8,592 |
$10,227
33,977
kWh
|
$7,817
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,808 | $9,897 |
$18,595
61,776
kWh
|
$14,213
-
kW-mo/yr
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,505 | $5,269 |
$11,622
38,610
kWh
|
$8,883
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $61,029 | $46,078 |
$30,241
100,467
kWh
|
$30,674
-
kW-mo/yr
|
$114 | |
09 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $2,705 | - |
$1,446
4,803
kWh
|
$1,259
-
kW-mo/yr
|
- | |
10 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $5,431 | $312 |
$2,905
9,652
kWh
|
$2,526
-
kW-mo/yr
|
- | |
11 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $808 | $104 |
$432
1,436
kWh
|
$376
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $2,133,723 | $831,591 |
$499,543
1,659,611
kWh
|
$1,634,066
-
kW-mo/yr
|
$114 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs