| Assessment Year | 2014 |
|---|---|
| Principal Product | Waste water treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $5 M to 10M |
| # of Employees | 15 |
| Plant Area |
300,000
ft2
|
| Annual Production | 2,920,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $400,690 | 3,522,665 |
kWh
|
$0.11 |
| Natural Gas | $43,321 | 3,880 |
MMBtu
|
$11.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,430 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,391 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,190 | $12,000 |
$12,190
107,216
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,511 | $29,280 |
$3,511
30,879
kWh
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,880 | $15,310 |
$2,880
25,336
kWh
|
- | |
| 04 | 2.7229: Air condition only space necessary | $849 | $4,000 | - |
$849
-
MMBtu
|
|
| TOTAL RECOMMENDED | $19,430 | $60,590 |
$18,581
163,431
kWh
|
$849
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,391 | $44,590 |
$6,391
56,215
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs