Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Waste water treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 15
Plant Area 300,000
ft2
Annual Production 2,920,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,690 3,522,665
kWh
Natural Gas $43,321 3,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,190 $12,000 $12,190
107,216
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,511 $29,280 $3,511
30,879
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,880 $15,310 $2,880
25,336
kWh
-
04 2.7229: Air condition only space necessary $849 $4,000 - $849
-
MMBtu
TOTAL RECOMMENDED $19,430 $60,590 $18,581
163,431
kWh
$849
-
MMBtu
TOTAL IMPLEMENTED $6,391 $44,590 $6,391
56,215