ITAC Assessment: TN0691
ITAC logo
ITAC Assessment: TN0691
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wooden cabinetry components
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range n/a
# of Employees 252
Plant Area 212,230
ft2
Annual Production 11,750,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $533,226 8,631,008
kWh
Electricity Demand $210,915 20,126
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $381,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 4.721: Initiate a program to acquire iso certification $144,950 $100,000 $26,600
431,419
kWh
- $850
-
lb
$117,500
02 2.4151: Develop a repair/replace policy $110,155 $5,075 - - - $110,155
03 4.421: Modify current incentive program $85,000 $16,580 - - - $85,000
04 2.3191: Use demand controller or load shedder $16,545 $18,900 - $16,545
-
kW-mo/yr
- -
05 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $11,700 $35,640 $11,700
188,746
kWh
- - -
06 3.5311: Recover and reuse waste material $10,100 - - - $10,100
-
lb
-
07 2.7145: Install skylights $2,160 $9,680 $2,160
34,877
kWh
- - -
08 3.7196: Use re-usable filters $640 - - - $640
-
lb
-
TOTAL RECOMMENDED $381,250 $185,875 $40,460
655,042
kWh
$16,545
-
kW-mo/yr
$11,590
-
lb
$312,655
TOTAL IMPLEMENTED $640 - - - $640
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs