ITAC Assessment: TN0675
ITAC logo
ITAC Assessment: TN0675
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Truck Cabs
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 164
Plant Area 115,000
ft2
Annual Production 13,595
pieces
Production Hrs. Annual 3,920
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $342,552 6,228,020
kWh
Electricity Demand $61,017 18,046
kW-mo/yr
Electricity Fees $9,318 -
Natural Gas $166,689 38,717
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,764

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Primary Product Savings
01 2.4151: Develop a repair/replace policy $72,335 $1,075 $385
8,206
kWh
- - - - $71,950
02 3.6112: Use filter and drying oven to reduce sludge volume $20,125 $25,600 - - - - $20,125
-
lb
-
03 4.432: Cross-train personnel to avoid lost time $18,800 $16,000 - - - - - $18,800
04 2.7243: Improve air circulation with destratification fans / other methods $9,789 $16,600 $3,845
67,409
kWh
$5,944
-
MMBtu
- - - -
05 3.5313: Increase amount of waste recovered for resale $8,725 $6,000 - - - $8,725
-
lb
- -
06 3.4116: Meter recycled water (to reduce sewer charges) $2,450 $3,300 - - $2,450
-
Tgal
- - -
07 2.6212: Turn off equipment during breaks, reduce operating time $1,844 - $1,844
542,497
kWh
- - - - -
TOTAL RECOMMENDED $134,068 $68,575 $6,074
618,112
kWh
$5,944
-
MMBtu
$2,450
-
Tgal
$8,725
-
lb
$20,125
-
lb
$90,750
TOTAL IMPLEMENTED $39,764 $41,900 $3,845
67,409
kWh
$5,944
-
MMBtu
$2,450
-
Tgal
$8,725
-
lb
- $18,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs