Assessment Year | 2000 |
---|---|
Principal Product | Truck Cabs |
NAICS |
n/a
|
SIC | 3713: Truck and Bus Bodies |
Sales Range | $10 M to 50M |
# of Employees | 164 |
Plant Area |
115,000
ft2
|
Annual Production | 13,595
pieces
|
Production Hrs. Annual | 3,920
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $342,552 | 6,228,020 |
kWh
|
$0.055 |
Electricity Demand | $61,017 | 18,046 |
kW-mo/yr
|
$3.38 |
Electricity Fees | $9,318 | - |
|
- |
Natural Gas | $166,689 | 38,717 |
MMBtu
|
$4.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $134,068 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,764 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4151: Develop a repair/replace policy | $72,335 | $1,075 |
$385
8,206
kWh
|
- | - | - | - | $71,950 | |
02 | 3.6112: Use filter and drying oven to reduce sludge volume | $20,125 | $25,600 | - | - | - | - |
$20,125
-
lb
|
- | |
03 | 4.432: Cross-train personnel to avoid lost time | $18,800 | $16,000 | - | - | - | - | - | $18,800 | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $9,789 | $16,600 |
$3,845
67,409
kWh
|
$5,944
-
MMBtu
|
- | - | - | - | |
05 | 3.5313: Increase amount of waste recovered for resale | $8,725 | $6,000 | - | - | - |
$8,725
-
lb
|
- | - | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $2,450 | $3,300 | - | - |
$2,450
-
Tgal
|
- | - | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,844 | - |
$1,844
542,497
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $134,068 | $68,575 |
$6,074
618,112
kWh
|
$5,944
-
MMBtu
|
$2,450
-
Tgal
|
$8,725
-
lb
|
$20,125
-
lb
|
$90,750 | ||
TOTAL IMPLEMENTED | $39,764 | $41,900 |
$3,845
67,409
kWh
|
$5,944
-
MMBtu
|
$2,450
-
Tgal
|
$8,725
-
lb
|
- | $18,800 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs