ITAC Assessment: TN0669
ITAC logo
ITAC Assessment: TN0669
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Flour
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 200,000
ft2
Annual Production 1,800,000
units
Production Hrs. Annual 8,700
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,975 12,199,004
kWh
Electricity Demand $149,587 26,762
kW-mo/yr
Natural Gas $49,745 7,232
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 4.431: Train operators for maximum operating efficiency $30,500 $4,500 n/a - - - - - $30,500
02 2.4157: Establish a predictive maintenance program $26,935 $1,075 n/a $23,900
854,045
kWh
- - $(-715.0) $3,750 -
03 2.3212: Optimize plant power factor $4,942 $9,500 n/a - $4,942 - - - -
04 3.5311: Recover and reuse waste material $1,875 - n/a - - $1,875
-
lb
- - -
05 2.2437: Recover waste heat from equipment $1,601 $1,620 n/a $1,601
67,995
kWh
- - - - -
06 3.5217: Reuse / recycle/ sell paper products $1,215 $600 n/a - - $1,215
-
lb
- - -
TOTAL RECOMMENDED $67,068 $17,295 $25,501
922,040
kWh
$4,942 $3,090
-
lb
$(-715.0) $3,750 $30,500
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs