| Assessment Year | 2000 |
|---|---|
| Principal Product | Flexible intermediate bulk containers |
| NAICS |
n/a
|
| SIC | 2673: Plastics, Foil, and Coated Paper Bags |
| Sales Range | $10 M to 50M |
| # of Employees | 143 |
| Plant Area |
40,000
ft2
|
| Annual Production | 500,000
pieces
|
| Production Hrs. Annual | 4,845
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $38,076 | 970,692 |
kWh
|
$0.039 |
| Electricity Demand | $29,236 | 3,103 |
kW-mo/yr
|
$9.42 |
| Electricity Fees | $600 | - |
|
- |
| LPG | $9,458 | 973 |
MMBtu
|
$9.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $86,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,515 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.111: Add equipment/ operators to reduce production bottleneck | $24,000 | $45,920 | - | - | - | - | - | - | $24,000 | |
| 02 | 4.431: Train operators for maximum operating efficiency | $18,800 | $16,000 | - | - | - | - | - | $18,800 | - | |
| 03 | 2.7261: Install timers and/or thermostats | $12,160 | $3,250 | - | - | - |
$12,160
-
MMBtu
|
- | - | - | |
| 04 | 4.111: Add equipment/ operators to reduce production bottleneck | $9,945 | $16,050 | - | - | - | - | - | - | $9,945 | |
| 05 | 3.5313: Increase amount of waste recovered for resale | $5,902 | $5,705 | - | - | - | - |
$5,902
-
lb
|
- | - | |
| 06 | 2.3191: Use demand controller or load shedder | $3,640 | $4,620 | - |
$3,640
-
kW-mo/yr
|
- | - | - | - | - | |
| 07 | 2.7145: Install skylights | $2,460 | $5,070 | - | - | - |
$2,460
-
MMBtu
|
- | - | - | |
| 08 | 3.5313: Increase amount of waste recovered for resale | $1,433 | $800 | - | - | - | - |
$1,433
-
lb
|
- | - | |
| 09 | 2.2437: Recover waste heat from equipment | $1,120 | $1,460 | - | - | - |
$1,120
-
MMBtu
|
- | - | - | |
| 10 | 2.4314: Use synthetic lubricant | $900 | - |
$680
9,672
kWh
|
$220
-
kW-mo/yr
|
- | - | - | - | - | |
| 11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $560 | $1,200 |
$420
5,862
kWh
|
$140
-
kW-mo/yr
|
- | - | - | - | - | |
| 12 | 2.1331: Burn a less expensive grade of fuel | $4,100 | $5,620 | - | - |
$(-5,358.0)
-
MMBtu
|
$9,458
-
MMBtu
|
- | - | - | |
| 13 | 3.6192: Use a less expensive method of waste removal | $1,380 | - | - | - | - | - |
$1,380
-
lb
|
- | - | |
| TOTAL RECOMMENDED | $86,400 | $105,695 |
$1,100
15,534
kWh
|
$4,000
-
kW-mo/yr
|
$(-5,358.0)
-
MMBtu
|
$25,198
-
MMBtu
|
$8,715
-
lb
|
$18,800 | $33,945 | ||
| TOTAL IMPLEMENTED | $44,515 | $33,035 |
$1,100
15,534
kWh
|
$4,000
-
kW-mo/yr
|
- |
$13,280
-
MMBtu
|
$7,335
-
lb
|
$18,800 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs