ITAC Assessment: TN0665
ITAC logo
ITAC Assessment: TN0665
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Houseboats
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 245
Plant Area 137,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,951 443,142
kWh
Electricity Demand $10,391 1,732
kW-mo/yr
Electricity Fees $1,363 -
LPG $3,177 426
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Primary Product Savings
01 4.421: Modify current incentive program $18,750 $30,000 n/a - - - - $18,750
02 3.5311: Recover and reuse waste material $13,460 $2,860 n/a - - - $13,460
-
lb
-
03 3.5311: Recover and reuse waste material $11,520 $6,670 n/a - - - $11,520
-
lb
-
04 3.5217: Reuse / recycle/ sell paper products $6,880 $480 n/a - - - $6,880
-
lb
-
05 2.5113: Use direct flame impingement or infrared processing for chamber type heating $6,106 $14,800 n/a - - $6,106
-
MMBtu
- -
06 2.7243: Improve air circulation with destratification fans / other methods $2,870 $3,144 n/a - - $2,870
-
MMBtu
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,005 $2,500 n/a - - $1,005
-
MMBtu
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $565 - n/a $349
10,258
kWh
$216
-
kW-mo/yr
- - -
09 3.5248: Separate and recycle scrap metal to foundry or for sale $520 - n/a - - - $520
-
lb
-
10 2.6212: Turn off equipment during breaks, reduce operating time $359 - n/a $359
10,551
kWh
- - - -
TOTAL RECOMMENDED $62,035 $60,454 $708
20,809
kWh
$216
-
kW-mo/yr
$9,981
-
MMBtu
$32,380
-
lb
$18,750
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs