ITAC Assessment: TN0632
ITAC logo
ITAC Assessment: TN0632
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Printed clothing Labels
NAICS
n/a
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $10
M
to 50
M
# of Employees 471
Plant Area 117,000
ft2
Annual Production 1,500,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,960 9,936,108
kWh
Electricity Demand $189,282 20,158
kW-mo/yr
Electricity Fees $3,216 -
Natural Gas $323,305 84,719
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
01 3.4155: Meter waste water $18,830 $3,300 - - - $18,830
-
Tgal
- -
02 2.7243: Improve air circulation with destratification fans / other methods $5,750 $14,700 $5,750
221,278
kWh
- - - - -
03 3.6192: Use a less expensive method of waste removal $7,020 - - - - - $7,020
-
lb
-
04 2.2437: Recover waste heat from equipment $1,890 $3,260 - - $1,890
-
MMBtu
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,480 $1,680 $690
26,377
kWh
$790
-
kW-mo/yr
- - - -
06 2.7261: Install timers and/or thermostats $1,520 $1,260 $1,520
58,617
kWh
- - - - -
07 4.431: Train operators for maximum operating efficiency $32,400 $47,100 - - - - - $32,400
TOTAL RECOMMENDED $68,890 $71,300 $7,960
306,272
kWh
$790
-
kW-mo/yr
$1,890
-
MMBtu
$18,830
-
Tgal
$7,020
-
lb
$32,400
TOTAL IMPLEMENTED $52,750 $51,660 $1,520
58,617
kWh
- - $18,830
-
Tgal
- $32,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs