ITAC Assessment: TN0631
ITAC logo
ITAC Assessment: TN0631
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Chopped Fiber Glass
NAICS
n/a
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 362,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,354,612 140,894,492
kWh
Electricity Demand $1,117,834 206,581
kW-mo/yr
Electricity Fees $(-25,036.0) -
Natural Gas $2,034,184 685,461
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $608,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings By-product Production Savings
01 3.5313: Increase amount of waste recovered for resale $494,000 $32,000 - - $190,000
-
lb
- $304,000
02 3.3128: Utilize other methods to remove contaminants $89,750 $45,600 - $89,750
-
gal
- - -
03 4.431: Train operators for maximum operating efficiency $7,500 $5,600 - - - $7,500 -
04 2.7131: Add area lighting switches $6,606 $10,900 $6,606
235,932
kWh
- - - -
05 2.7261: Install timers and/or thermostats $5,830 $7,750 $5,830
208,089
kWh
- - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,925 $4,725 $4,925
175,850
kWh
- - - -
TOTAL RECOMMENDED $608,611 $106,575 $17,361
619,871
kWh
$89,750
-
gal
$190,000
-
lb
$7,500 $304,000
TOTAL IMPLEMENTED $5,830 $7,750 $5,830
208,089
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs