ITAC Assessment: TN0627
ITAC logo
ITAC Assessment: TN0627
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Automotive parts racks
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 100,000
ft2
Annual Production 3,800
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,698 990,035
kWh
Electricity Demand $24,068 3,694
kW-mo/yr
Electricity Fees $(-14,849.0) -
Natural Gas $14,640 2,791
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
01 4.122: Develop standard procedures to improve internal yields $10,875 - n/a - - - - - - $10,875
02 3.1191: Change procedures / equipment / operating conditions $10,100 $1,600 n/a - - - $100 $10,000 - -
03 3.5311: Recover and reuse waste material $2,550 $2,900 n/a - - - - - $2,550 -
04 2.7111: Reduce illumination to minimum necessary levels $2,330 $490 n/a $870
28,136
kWh
$1,460
-
kW-mo/yr
- - - - -
05 2.6232: Install set-back timers $640 $960 n/a $640
20,516
kWh
- - - - - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $360 - n/a - - $360
-
lb
- - - -
TOTAL RECOMMENDED $26,855 $5,950 $1,510
48,652
kWh
$1,460
-
kW-mo/yr
$360
-
lb
$100 $10,000 $2,550 $10,875
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs