ITAC Assessment: TN0625
ITAC logo
ITAC Assessment: TN0625
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Hardwood lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 79
Plant Area 30,000
ft2
Annual Production 20,000
thousand feet
Production Hrs. Annual 4,250
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,761 2,321,219
kWh
Electricity Demand $39,442 6,969
kW-mo/yr
Electricity Fees $28,988 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $376,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,365

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.445: Install equipment to move product $65,150 $545,645 - - - $58,750 - $6,400
02 3.6123: Burn wood by-products for heat $237,780 $900,000 $142,900
6,424,385
kWh
- $200,000
-
lb
$(-105,120.0) - -
03 3.7212: Improved material handling (mixing and transfer) $60,120 $116,240 - - $60,120
-
lb
- - -
04 3.8136: Switch to a solvent that can be cleaned and re-used $9,965 $5,000 - - - - $9,965 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,380 $6,370 $550
32,532
kWh
$1,830
-
kW-mo/yr
- - - -
06 2.6212: Turn off equipment during breaks, reduce operating time $900 - $900
53,048
kWh
- - - - -
07 2.7261: Install timers and/or thermostats $210 $465 $210
12,309
kWh
- - - - -
TOTAL RECOMMENDED $376,505 $1,573,720 $144,560
6,522,274
kWh
$1,830
-
kW-mo/yr
$260,120
-
lb
$(-46,370.0) $9,965 $6,400
TOTAL IMPLEMENTED $73,365 $127,610 $1,450
85,580
kWh
$1,830
-
kW-mo/yr
$60,120
-
lb
- $9,965 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs