ITAC Assessment: TN0621
ITAC logo
ITAC Assessment: TN0621
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Occasional wooden tables and entertainment centers
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 352,700
ft2
Annual Production 95,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,058 6,318,875
kWh
Electricity Demand $25,760 20,543
kW-mo/yr
Electricity Fees $67,200 -
Coal $52,642 27,999
MMBtu
Wood $5,419 46,830
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Coal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $24,470 $4,300 $10,430
260,844
kWh
- $14,040
-
MMBtu
- - - - -
02 4.321: Optimize production lot sizes and inventories $17,500 $17,900 - - - - - - $17,500 -
03 2.6242: Minimize operation of equipment maintained in standby condition $14,220 $27,690 $14,220
355,510
kWh
- - - - - - -
04 3.8142: Distill contaminated solvents for reuse $8,175 $9,600 $(-150.0)
(-3,810)
kWh
- - $945
-
gal
- - $1,440 $5,940
05 2.4323: Use optimum size and capacity equipment $5,980 $17,100 $26,980
674,385
kWh
- - - - $(-21,000.0) - -
06 2.3212: Optimize plant power factor $5,710 $17,000 - $5,710 - - - - - -
07 2.6212: Turn off equipment during breaks, reduce operating time $2,400 - $2,400
60,082
kWh
- - - - - - -
08 3.7311: Maintain machines to reduce leaks $1,980 $2,780 - - - $1,260
-
gal
- - - $720
09 3.5315: Lease / purchase baler; sell cardboard to recycler $655 - - - - - $655
-
lb
- - -
TOTAL RECOMMENDED $81,090 $96,370 $53,880
1,347,011
kWh
$5,710 $14,040
-
MMBtu
$2,205
-
gal
$655
-
lb
$(-21,000.0) $18,940 $6,660
TOTAL IMPLEMENTED $19,480 $20,680 - - - $1,260
-
gal
- - $17,500 $720
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Coal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs